Modular Weight Room / Excessive Building

[CHALLENGE]
A U.S. National Park we in need of a building to house free weights and exercise equipment. They decided that a modular building they could lease would give them the most flexibility with schedule and budget.

[SOLUTION]
Modular Genius constructed a modular building with increased floor loads to hold the weights and equipment. A 1,440 Sq Ft modular building was built delivered and installed on site in approx. 90 days from contract to completion.


Prefabricated Daycare Modular Building

[CHALLENGE]
A Hospital was in need of daycare space but there was no room inside the building. There was a slopped piece of land on campus that the a building could be constructed and connected to the main campus by corridor.

[SOLUTION]
Modular Genius constructed a foundation for the modular building on the hill and built to meet the specific needs per code. A 1,440 Sq Ft modular building was built delivered and installed on site in approx. 90 days from contract to completion.


Modular Office Space

[CHALLENGE]
An Air National Guard facility was in need of additional office and meeting space. The new modular office space needed to look similar to surrounding buildings of the rural facility.

[SOLUTION]
Modular Genius provided a 1,440 office modular space to meeting the scope of work. This modular office space was installed with site built ramps and steps. The project was completed in 90 days from notice to proceed.


Administrative Modular Space

[CHALLENGE]
A US Air Force Base had to add additional seats to a growing facility. The administrative modular space needed to be set up under strict time frame a fit the look of the facility.

[SOLUTION]
Modular Genius provided a 3,600 office modular facility. This modular building was installed with site built ramps and steps. The project was completed in 90 days from notice to proceed.


Prefabricated Truck Scale House

[CHALLENGE]
An industrial company was in need of a scale house to check trucks in and out of a new entrance. The decision to construct a modular building was made to insure a speedy installation.

[SOLUTION]
Modular Genius had a 240 sq ft new modular building constructed for the customer. The prefabricated building was delivered and installed in 90 days from notice to proceed.


Modular Locker Room / Break Room

[CHALLENGE]
An Industrial Company was in need of upgrading the facilities for its workers. The building had to be durable, fit on a small part of the property and installed quickly.

[SOLUTION]
Modular Genius built a new 1,440 Sq Ft modular break room building for the client. The floors were installed with an epoxy resin to insure the surface could be cleaned regularly and would not wear out with traffic. Modular Genius provided a turnkey installation in 120 days from award to occupancy.


Federal and State Modular Police Station

[CHALLENGE]
The State Police in Maryland in conjunction with Homeland Security needed a local facility in close proximity to a major highway. The esthetics was important to the customer for this project as this was going to be a permanent modular building.

[SOLUTION]
Modular Genius provided a 7,000 sq ft modular building inclusive of offices, administrative space, training rooms and restrooms. The project was completed in 150 days from award to occupancy.


Women’s Shelter Modular Building

[CHALLENGE]
A county government was renovating a local women’s shelter. The project required a temporary modular complex to displace the women during the renovation.

[SOLUTION]
Modular Genius provide a 7,920 square foot modular classroom complex for the project. Modular Genius provided the customer the building inclusive of prefabricated aluminum decks, ramps. The project was complete in 90 days from award to occupancy.


Modular Counseling Center Building

[CHALLENGE]
A county school was in need of new counseling center for at risk children. The project was design to be a modular building for easy of design and expedited delivery.

[SOLUTION]
Modular Genius constructed a 2,160 square foot modular classroom complex for the project. Modular Genius provided the customer engineering, foundations, decks, ramps, mechanical, plumbing, electric and communication connections. The project was complete in 120 days from award to occupancy.


Administrative Modular Space

[CHALLENGE]
The US National Guard had to add additional seats to a growing facility. The administrative modular space needed to be set up under strict time frame with a tight budget consideration.

[SOLUTION]
Modular Genius provided a 4,320 modular facility. This modular building was installed with prefabricated aluminum steps and ramps. The project was completed in 120 days from notice to proceed.