Prefabricated Truck Scale House

[CHALLENGE]
An industrial company was in need of a scale house to check trucks in and out of a new entrance. The decision to construct a modular building was made to insure a speedy installation.

[SOLUTION]
Modular Genius had a 240 sq ft new modular building constructed for the customer. The prefabricated building was delivered and installed in 90 days from notice to proceed.


Modular Locker Room / Break Room

[CHALLENGE]
An Industrial Company was in need of upgrading the facilities for its workers. The building had to be durable, fit on a small part of the property and installed quickly.

[SOLUTION]
Modular Genius built a new 1,440 Sq Ft modular break room building for the client. The floors were installed with an epoxy resin to insure the surface could be cleaned regularly and would not wear out with traffic. Modular Genius provided a turnkey installation in 120 days from award to occupancy.


Federal and State Modular Police Station

[CHALLENGE]
The State Police in Maryland in conjunction with Homeland Security needed a local facility in close proximity to a major highway. The esthetics was important to the customer for this project as this was going to be a permanent modular building.

[SOLUTION]
Modular Genius provided a 7,000 sq ft modular building inclusive of offices, administrative space, training rooms and restrooms. The project was completed in 150 days from award to occupancy.


Women’s Shelter Modular Building

[CHALLENGE]
A county government was renovating a local women’s shelter. The project required a temporary modular complex to displace the women during the renovation.

[SOLUTION]
Modular Genius provide a 7,920 square foot modular classroom complex for the project. Modular Genius provided the customer the building inclusive of prefabricated aluminum decks, ramps. The project was complete in 90 days from award to occupancy.


Modular Counseling Center Building

[CHALLENGE]
A county school was in need of new counseling center for at risk children. The project was design to be a modular building for easy of design and expedited delivery.

[SOLUTION]
Modular Genius constructed a 2,160 square foot modular classroom complex for the project. Modular Genius provided the customer engineering, foundations, decks, ramps, mechanical, plumbing, electric and communication connections. The project was complete in 120 days from award to occupancy.


Administrative Modular Space

[CHALLENGE]
The US National Guard had to add additional seats to a growing facility. The administrative modular space needed to be set up under strict time frame with a tight budget consideration.

[SOLUTION]
Modular Genius provided a 4,320 modular facility. This modular building was installed with prefabricated aluminum steps and ramps. The project was completed in 120 days from notice to proceed.


Modular Field Office

[CHALLENGE]
A Task Order Contractor working at an US Air Force Base needed a presentable field office for their staff. The office needed to fit on a small lot.

[SOLUTION] 
Modular Genius built this customer a 4,320 square foot modular field office. The design was a 72’ X 60’ building with multiple offices, a conference rooms and kitchen. The last sections of the modular were lifted into place by crane to fit on the site. The project was completed in 60 days from award to occupancy.

Image

 


Modular Classroom Complex

[CHALLENGE]
A county school district was renovating a school. The decision to move part of the school out into modular classrooms to expedite the renovation was made.

[SOLUTION]
Modular Genius. Modular Genius provided a 10,296 sq ft modular classroom complex. The building had (12) classrooms, a central corridor down the center and boys and girls restrooms.


Administrative Swing Space / MILCON

[CHALLENGE]
A Task Order Contractor working at an US Navy Base needed administrative space to house personal while their permanent MILCON building project was being constructed.

[SOLUTION]
Modular Genius provided (2) NEW 4,320 sq ft clear span modular buildings for the client. The buildings were shells and built our to fit the customer’s specific interior floor plan. The project was completed in 90 days from award to occupancy.


Modular Swing Space

[CHALLENGE]
A Task Order Contractor working at an US Navy Base was renovating a small building and needed to displace some people from a building.

[SOLUTION]
They contacted Modular Genius to provide a 1,440 sq ft modular to be used as swing space for the project. The design was a 24’ X 60’ in stock building which delivered and installed in 14 days from award to occupancy.